What will happen if we r using seton lr after return or vice
versa.
Answer Posted / sravan
Seton lr is last record indicator when it reaches system will close all the files what are the programs used in the program return the status will be the same
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to declare the pull button in AS/400..
what happens when sflsiz = sflpag? What are the advantages and disadvantages?
can any one help in hawkeye and turnover or any change management system plzzzzz or send the documents to my mail id :gvsp.as4@gmail.com
can you debug ile rpg program using isdb?
How to handle duplicate error handling in RPG?
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?
Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?
How can we override a file during runtime in rpg?
do you use message subfiles? What are the necessary keywords required coding a message subfile?
Interviewer asked me write down DDS for load all subfile .can anybody write dds
What is the purpose of record level identifier?
what is the necessary keyword needed to scroll subfile records?
what is kids-rpg?
what is file information data structure?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.