concrete cube strength if fail 1 no in 7 days .What is the
solution
Answer Posted / pk priyadarshi
in three numbers cube one number cube discard and take two numbers cubs average strength if strength is found as per required that is ok
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is labor and material payment bond?
What is the effect of a building collapse?
how can we calculate steel value, depending on load
.5Ast
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
cement and sand required for one block of size 0.23*0.15*0.46
What is chemical composion test
how many litres of enamel paint required for 5000 sft of site??
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
what is kribs is supporting?
how to calculate total cost for slab 35'×8'
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
What is the procedure of concealed plumbing in toilets?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard