why we do pcc.?

Answer Posted / yogesh yadav

plain cement
concret is a
base structre of
building,its save
to
renforcement
direct contact
to mud soil.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

psc girder detail

2717


How we calculate the service time of buildings

1431


Explain soil analysis?

664


What is an ortho mode?

726


what is the difference between tsp & tower

1710






Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1399


what is the use in canals of longitudinal drains and cross drains in lining areas?

1377


How to testing voids of filled aggregate in bitumen mix design

1464


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1647


Define relative co-ordinates?

696


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

2310


how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?

1956


Consumption of Binding wire for fixing of cover block in vertical surface

1048


20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

1896


how to calculate load bearing column

3058