Answer Posted / yogesh yadav
plain cement
concret is a
base structre of
building,its save
to
renforcement
direct contact
to mud soil.
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
psc girder detail
How we calculate the service time of buildings
Explain soil analysis?
What is an ortho mode?
what is the difference between tsp & tower
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
what is the use in canals of longitudinal drains and cross drains in lining areas?
How to testing voids of filled aggregate in bitumen mix design
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Define relative co-ordinates?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
Consumption of Binding wire for fixing of cover block in vertical surface
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
how to calculate load bearing column