Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??

Answer Posted / karthik rajendren

3% for Concrete & rebar
5% for Brick/Block Work,Plaster& Tile

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

1567


Which brick is best for construction ,either fly ash or AAC BLOCKS

580


1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall

1928


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

1680


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1422






can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?

2061


How is calculate the cube molt

1786


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2387


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

1100


what is civil all interview questions

2069


Wat is meant by Aecron brick?

1646


Define What happens to Load at yielding ?

1321


What are the advantages and disadvantages of lead products in construction?

733


How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.

2183


yasser arfatcompleted his degree in civil from which university

1794