What is the correct procedure to shutdown VCB in 11kv
substation.safety and work procedure

Answer Posted / balaji

1. Preparation (Permit to work)
2. Separation (Trip the Breaker)
3. Isolation (Isolator isolates)
4. Earthing & Short circuit (Earthing)
5. Screening & Marking the area (Barricading the work area)

Is This Answer Correct ?    11 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.

1486


What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?

2012


How many sprinklers should be in one pipe line?

1421


How to calculate mf when meter equipment and meter are connected

1269


What are the advantage of free wheeling diode in a full wave rectifier?

643






sir i am apearing for nic exam.i dont know exam pattern.can you please send me some model papers

1498


define hysteresis loss, eddy current loss and windage loss

1534


Does outdoor isolator loose connection cause short circuit current in that circuit? if yes then how ??

1203


What is systematic error?

816


How is the resonant peak, resonant frequency, and bandwidth determined from nichols chart?

657


what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?

1480


wHAT IS CAPACITANCE LATCHING? hOW TO CALCULATE CAPACITANCE LATCHING? hOW TO SOLVE THE PROBLEM IF CAPACITANCE LATCHING APPLIED?

1540


How to calculate the sag of OPGW during stringing???

2141


what is the ATS .And how it works.

1048


what is servo motor & how does it work.

1496