Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answer Posted / gopi
(3.14*0.3*0.3/4)*10=0.7065m3
| Is This Answer Correct ? | 19 Yes | 21 No |
Post New Answer View All Answers
how to find quantity of concrete in PCC M15
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
Calculation of curtain wall of box culvert
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
For a washout valve why are two gate valves required in normal practice?
how to stop beam concrete between column
define the strength
how to caliculate required amount of cement and sand required for 1cu.m.
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is constat for brickwork
What do you mean by tolerance factor of concrete ?