It needs contour survey before plastering a wall / column &
floor tiles setting to get––
Answer Posted / sjtbehera
Yes, because there are very undual surface, honeycomb are there. It need to rectify.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the difference between prime coat and tack coat in road construction
What is portland cement
Stringer How many cm goes to landind
What is the likely strength of a 1:2:4 concrete mix?
What is M40 _ TOR - EQ and B.F.S
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
why does the most of civil engg is not intersted to going for teaching field?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
what will happen if one could not properly follow the spacing of slab reinforcement bar?