a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer Posted / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
How will be cutting in timber plate size 600*400 column size
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
Who name us Engineer & Why?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
Why are the bolts that hold steel rails together in oval holes?
how many types of survey and what are levelling instrument?
What is different between DI Pipe and CI pipe?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
what would be the design load of R.C.C Cooling tower per cell.?
Why you are leaving present job?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you