1.how to calculate 4*3 runner qty in cft.
2.how to calculate the nails qty.(column,beam,slab)
3.if any formula for binding wire qty calculation.
Answer Posted / ratheesh
1. First you have to convert inches to feet, 1 inch =
.083feet, Then u have to multiple length, breadth & width.
2. approximate .750grms to 1kg for 1 sqm shuttering.
Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
The portion of a brick cut across the width is called?
What is the difference between built area and super built up area?
What Are The Different Type Of Slump Test Indications?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
What are the materials used in building a gravity dam?
how to take concrete quantity for precast segment for viaduct project?
The mixture of different ingredients of cement is burnt at?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
How to calculate the quantity of ingredients of M20 grade concrete?
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
for pretensioning which will yield first and same for post tensioning?
In earth work 1300 cum soil how to calculate how many liters require in water
What is the coeffiencent Friction Angle between Steel and Ashphalt?
what is meant by shear center?????