Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much steel required for 1 sq.m area?

Answer Posted / balamurugan r

As per thumb rule steel requirement per sqft for residential
buildings is 4-4.5Kg/Sqft. So just convert it into sqm. It
will around 40-48Kg/Sqm.

Is This Answer Correct ?    23 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is .Dwg?

1307


Define What is a projection line?

1175


What is semirigid connections?

2181


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

2050


What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...

1983


How much is the cover for slab?

1304


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1893


What should be the standard roof height like to be?

1231


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

2100


How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

2096


how to nfind out the specific gravity of sand.aggregate,water please help...

2236


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1653


How is calculate the cube molt

2286


03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1

2290


how much used soil in 1 brick of standard size?

2095