Answer Posted / waseem athar
Lap should be provided in splice zone or mid zone of column and it should be 50 times of dia of bar.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
How to get MEP technical,instaaltion & testing data for interview?
how to calculate spacing rod in column
quantity of material needed for rubble stone masonry for 1:4 and 1:6
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
What are the different methods for drawing an arc?
What is the use of water table & Kreb stone for drain
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Civil engineering related
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
What is bylayer?
Time required for curing of wall tiles before fixing
Define What are the uses of alloys in daily life and how are alloys made?
how to calculate reinforcment in staircase cranked beam?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?