1.I have a Batch job, Running for 4 hours, i want to reduce
the executing time to 2 hours what should you do?

Answer Posted / sivaprasad

the most possible way to reduce the running time for batch
job, have to hold the remaining jobs make it has not burden
on subsystem....

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?

1455


what is the procedure and explain about real time scenario.

1479


is this a rpg channel?

681


How can we override a file during runtime in rpg?

688


how do I play {insert rpg system here}?

585






what do you mean by an input subfile, what are the keywords required?

773


Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?

4210


explain sflclr, sflend, sfldlt, and sflcsrrrn?

889


What are the types of identifiers?

572


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

769


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1761


what is file information data structure?

1374


can I touch the array during treatments?

758


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1561


can anybody help me to solve this problem. the program that i m checking display error message saying "Record format for file AJDSPFFD does not match model file and decimal error. how to solve this problem. The AJDSPFFD is snapshot the AJTLOG that is the audit trail list.

2278