In 120 m high RCC Chimney shell construction how we can
calculate the inner and outer dia of shell at every +1 m
level as this shell is inclined from bottom to top.
Answer Posted / m.senthilkumar
(bottom outer dia- top outer dia)/ height=average reduce the
dia per 1mt
inner dia =outer dia is checked ok so just measurement wall
thickness is correct or not
example:
bottom outer dia=100mt top outer dia =82mt height=120mt wall
thickness=0.5mt
(100-82)/120=0.15mt each 1mt reduce the dia 0.15mt ok
+4m outer dia=(100-(4*.15))=99.40mt dia
+4m inner dia=(99.40-2*0.5(wall thickness)=98.40mt dia
chimney 90degree maintain =center point maintain 0 to 120mt&
check radius every +1mt
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is alternate bid?
how to calculate the density for high density concrete ? or is it same as the density of RC?
Difference between pre-tensioning and post-tensioning.
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
What is an ortho mode?
Reinforcement details at hinged joint
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
what is stressing
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What is Base Shear ?
satart to end steps by step process of building construction...? i want to planning theme accuretly
what is the effect of duration of earth quake on framed structures ?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.