In 120 m high RCC Chimney shell construction how we can
calculate the inner and outer dia of shell at every +1 m
level as this shell is inclined from bottom to top.
Answer Posted / m.senthilkumar
(bottom outer dia- top outer dia)/ height=average reduce the
dia per 1mt
inner dia =outer dia is checked ok so just measurement wall
thickness is correct or not
example:
bottom outer dia=100mt top outer dia =82mt height=120mt wall
thickness=0.5mt
(100-82)/120=0.15mt each 1mt reduce the dia 0.15mt ok
+4m outer dia=(100-(4*.15))=99.40mt dia
+4m inner dia=(99.40-2*0.5(wall thickness)=98.40mt dia
chimney 90degree maintain =center point maintain 0 to 120mt&
check radius every +1mt
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
What is the difference between linear dimension and aligned dimension?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
which type of instrument included in plumbing work?name of instrument?
howto calculate the quantities of material used in fly ash brick after finding the volume??
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
How to calculate construction cost of residential building in mumbai
What is missing report and how to prepare
Why joints are provided?
what is the weight of 6000 psi concrete in lb/cft?
What is the usage of zoom command?
what is raft foundation
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What is an ice dam sock?