What are the different phases of SDLC ?

Answer Posted / kripaa shankar

The follwing are the phases of SDLC.
1. Definition of the problem - Identifying the requirement
2. User Requirement Study - Interview, JAD( Joint
Application Development), Survey Method.
Outcome - Functional Specifications Document - High Level
3. Discussion and GAP Analysis - Submitting our level of
understanding to the user and conduct suitable GAP analysis
in understanding requirements.
Outcome - Detailed FS, Prototype, Use Cases, Flow charts,
Logical Data Model and Process Model.
4. Feasibility Study and Cost Benefit Analysis
5. Sign-off and establish a protocol for Change Request.
6. Design - Functional and System Design
Outcome - Dataflow and process flow design with the
suggested Design Methodology.
7. Development - Coding/programming the application.
8. Testing - Functional Testing (Black Box and White Box),
Code Testing and User Acceptance Testing (Concurrent
Testing (if multiple users are involved) and Regression
Testing).
Outcome - Test Documents with error reporting at every
stage.
9. Quality Management - Software quality team will check
the system against established standards
Outcome - Certification
10. Implementation
11. Maintenance

Is This Answer Correct ?    135 Yes 61 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why do you want to work for Microsoft?

2716


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

6489


how to tell project details in interview the project is funds flow analysis?

1176


Write the instr function.

743


What training have you undergone in project planning?

3330






How did you choose the appropriate lifecycle for your project?

2890


What is the project management structure in your project? Is a PL assigned to the project?

2041


Tell about current project ?

2219


Did you used crystal reports? Do you have sufficient knowledge on crystal reports?

2160


create a flow diagram up to 2 levels for hospital management

3231


How do you create the Software Project Management Plan (SPMP)?

4045


When you come in to the office, how do you know what you have to do during the day?

1934


How are the team members kept informed about the current status of the project?

2180


Test the save dialog in Notepad?

4189


What is the role of CLR in ASP.NET?

3201