when we need to close the production order, before the
manufacturing or after the manufacturing
Answer Posted / ajit kumar santi
Goods movement can be posted in TECO status, but in closed status it can't and goods receipt is made after production. so close production order is made after manufacturing.
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What are sequence, parallel, overlapping, splitting and where can we assign these
What are the parameters are there in Order type or in dependent para. config?
In implementation stage tell some standard scenario before AS-Is & TO-BE
How is indian slab and us slab?
How do I default it 41?
Explain the uses of the simple maintenance interface?
Explain how to create prt master records?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Explain what happens to planned after it has been converted into production order?
What are the types of MIC?
What are the different type of BOM usage?
You want to integrate pp with fico. What steps would you take?
In cost controlling information system mention the fields that are listed in the list screen of the report?
Do you have any idea about Capacity Planning?
What is the use of stock requirement list?