when we need to close the production order, before the
manufacturing or after the manufacturing

Answer Posted / ajit kumar santi

Goods movement can be posted in TECO status, but in closed status it can't and goods receipt is made after production. so close production order is made after manufacturing.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are sequence, parallel, overlapping, splitting and where can we assign these

1534


What are the parameters are there in Order type or in dependent para. config?

1107


In implementation stage tell some standard scenario before AS-Is & TO-BE

1387


How is indian slab and us slab?

634


How do I default it 41?

592






Explain the uses of the simple maintenance interface?

637


Explain how to create prt master records?

670


Is it possible to convert a 'multiple bom' into a 'variant bom'?

722


Explain what happens to planned after it has been converted into production order?

558


What are the types of MIC?

1216


What are the different type of BOM usage?

1244


You want to integrate pp with fico. What steps would you take?

588


In cost controlling information system mention the fields that are listed in the list screen of the report?

695


Do you have any idea about Capacity Planning?

1519


What is the use of stock requirement list?

651