how many testing use in power transformer?tell equipment
names?

Answer Posted / sudhakar g

HI,
Power transformer is used in Switchyards where it can
supply the voltage from grid to grid and the strutcure of
the transformer is Delta to Delta connection. there is no
stepup or step down in that.

I am taking Electrical desining classes in Bangalore...It
will be usefull for designing as well as site engineers
those who are intrested to go for Electrical
Engineers....we give you indepth knowledge of Load calu,
Cable sizing, Lighting cal, panels, breaker
selection,Autocad drawing....if any body intrested means
pls call to +91-7760362623 or sudhakar28485@gmail.com

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the importance of earthing?

669


why the arc welding machines require parallel earthing systems? ie why each machines are connected to earth pit by separate wires during earthing? wats it adavantages?

1733


how can i get the formula to find out the cable size if i know the load of main fuse protection.

1437


oltc of a transformer, how it works? and what are the equipment consist of describe briefly?

1571


What will happen if the d.c. Shunt motor opened accidentally running on no-load has its shunt field winding?

893






What is the unit of magnetic flux density?

714


What is a parabolic signal?

641


how braking & making capacity of circuit breaker are calculated?

1851


Why field rheostat is kept in minimum position?

716


How to calculate cable rating for 3 phase supply?

1719


What happen if we apply square wave or traiangular waveform voltage to the transformer primary winding instead of sinusoidal wave?

1640


what is lumped and distributed elements?

1549


Define noise?

724


why incomer bay is required before transformer bay if there are more than 1 nos. of transformer bay.

2625


Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.

1574