1.Suppose my file has 10 fields and I want to make the 2nd
field Zeros in all records. And assume I have millions of
records and I dont want to read each record and update the
desired field with 0. Any other way to do this in one step
operation?
2. Assume my file has 100 records and I want to see only
first 10 records. Is this possible through LF?
3.I have 3 jobs A B and C. I want to submit B after
successful completion of A and want to submit C after
successful completion of B. Without using job scheduler or
job queue, how can i do that through CL program?
4.What is difference between Bind by copy and bind by reference?

Answer Posted / sujatha

3. Submit job B can be included at the end of call program
in SBMJOB A. Likewise SBMJOB C can be done at the end of
call program of job B.

SBMJOB Call A

Program A:
----------
PGM
....
....
MONMSG CPF0000 GOTO END
SBMJOB B
END: ENDPGM

Program B:
-----------
PGM
.....
.....
MONMSG CPF0000 GOTO END
SBMJOB C
End: ENDPGM

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how does the rpg element work?

718


what is the necessary keyword needed to scroll subfile records?

704


thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400

1896


can you debug ile rpg program using isdb?

739


What is the difference between iter and do?

677






what is a rpg?

703


what do you mean by an input subfile, what are the keywords required?

775


do you use message subfiles? What are the necessary keywords required coding a message subfile?

690


Interviewer asked me write down DDS for load all subfile .can anybody write dds

1022


How many program bind in one module....

2125


explain sflclr, sflend, sfldlt, and sflcsrrrn?

891


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1764


Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.

2054


what are the key words you must use when using a subfile?

694


How to call one program from another program in RPG? please help me with the code

1261