Answer Posted / praveen kumar paulraj
PLC based process automation panels. which is nothing but
control system which uses PLC .the same process can be
controlled by other control systems, but, why by PLC because
in PLC we can write the logic by ladder diagrams,so that the
electrical engineer can understand the logic and, he can
easily re-program the logic in side the plc because the
ladder logic is just like wiring diagram.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
7- What is the Dissipation Factor and the difference between it and Insulation Resistance Test? 8- What is the task (function) of DC and AC reactors in power plant? 9- What is the task (function) of (open delta with earthed) in some types in transformers? 10- What is the base of the selection of the vector group in transformers? 11- What is the zig-zag transformer and its function by drawing in large detail? 12- What is the polarity ? 13- Why we make short between phase(R) in high side and phase (r) in low side in vector group test? Where High Side ( R ,S and T ) and Low Side ( r ,s and t ). 14- What are the time on delay and time off delay? 15- What is the vector group? 15- What is the task (function) of different types of vector group such as Dyn11 , Dd0 , YNd1,……..,?
what is the clear formula to calculate cable size for a load
How Diesel Generator start ?
Why generation voltage in thermal power plant is between 11kv to 33kv?
how to prepare the technical test
What is a fuse? How does it work? What are materials used?
why on axial hitting up of air blast on hydrogen produced in oil circuit breaker,temperature rises of the core of the arc?
Who are the manufactures those manufacturing 3Cx2.5sqmm FRLS cables. I heard about FRLS technology adopted only in wires useful for wirings
If Neutral Grounding Resistor (GR) failed/shorted. Is it repairable.
actually i can't understand what is 3dB ? and it's really not clear to me.please any one let it me be cleared.
how can i get an electrical c-certificate?
How to measure power in 2 or 4 or n phase circuit? Please give me a formula.
Why can't we take NO LOAD TRIAL of motors having V1 mounting??
how we provide neutral earth on synchronising panel as per electrical standards?
Diagram on interconnectivity of 11kv transformer with RMU (i.e, one incoming and two outgoing or two incoming and one outgoing)