Answer Posted / karunakaran
For Beams sides only 1 day
For coloumns 1 day
For slabs span<4.50m 7 days
For slabs span>4.50m 14 days
Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
any book or article on pumped concrete.
What is the meaning of soil reinforcement?
why do we not deduct volume of steel to find actual volume of concrete in practical???
How to find out kg per Sft ?
Types of column foundation and how to calculate its steel quantity.
whou haat goals do you have in your career
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
Why you are leaving present job?
What is the release of lien?
silt%= silt volume/ silt+sand volume is this right?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Sir how to find cutting length for footing steel bars in the shape of "u"
what is the meaning of 40/20 src
What is the Maximum %age of Steel in columns and beams ?
Calculation of Pier Cap with tapper area?