what is the stripping time of beam column & slab?

Answer Posted / karunakaran

For Beams sides only 1 day
For coloumns 1 day
For slabs span<4.50m 7 days
For slabs span>4.50m 14 days

Is This Answer Correct ?    14 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

any book or article on pumped concrete.

1727


What is the meaning of soil reinforcement?

663


why do we not deduct volume of steel to find actual volume of concrete in practical???

1325


How to find out kg per Sft ?

1804


Types of column foundation and how to calculate its steel quantity.

1443






whou haat goals do you have in your career

1709


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2040


Why you are leaving present job?

1603


What is the release of lien?

693


silt%= silt volume/ silt+sand volume is this right?

1506


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

1170


Sir how to find cutting length for footing steel bars in the shape of "u"

1321


what is the meaning of 40/20 src

5760


What is the Maximum %age of Steel in columns and beams ?

722


Calculation of Pier Cap with tapper area?

5763