Dear Sir / Madam,
Actually we requied 64 A MCB,
But i have 32 A MCB = 2 No's
this two i have to make series connection and we usw any
place?
isit possible or not......
Answer Posted / hemant
if u connect 2 mcb's in series then it share load up to 32
amp only not for 64amp. if u used this two mcb then u must
to divided load in to two section like 32/32 amp. after
then u can connect load to out going terminals of mcbs.
Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
Why frequency changes due to load variation in power system ? i.e why when load increases frequency decreases?
What is the main cause of magnetism?
What is the most essential condition for the voltage build up for a d.c. Shunt generator?
what kn of disc is used in 33kv,132kv,220kv,400kv,800kv transmission line
Why do we pefer VCB over OCB?What are the advantages of VCB over OCB?
sir, iam a electrical engg graduate and i want to go in automation sector and for this i have decided to do industrial training for this,plz suggest me some good institute for the same in delhi,ncr. my degree percentage is 58%, can i get job after doing training, plz help....
Define the term Capacitance and Inductance?
how can we phase identification in a distribution line,how we recognise that which phase is coming for a house hold connection.help me............
what is frequency response?
Basic motor transformer generator
What is meant by vector group
What is self exciting?
Phase control and integral control are used for?
how to select proper cable for ct wiring so that drop within the limit.
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.