Dear Sir / Madam,

Actually we requied 64 A MCB,

But i have 32 A MCB = 2 No's

this two i have to make series connection and we usw any
place?

isit possible or not......

Answer Posted / hemant

if u connect 2 mcb's in series then it share load up to 32
amp only not for 64amp. if u used this two mcb then u must
to divided load in to two section like 32/32 amp. after
then u can connect load to out going terminals of mcbs.

Is This Answer Correct ?    14 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why frequency changes due to load variation in power system ? i.e why when load increases frequency decreases?

1497


What is the main cause of magnetism?

1587


What is the most essential condition for the voltage build up for a d.c. Shunt generator?

675


what kn of disc is used in 33kv,132kv,220kv,400kv,800kv transmission line

2862


Why do we pefer VCB over OCB?What are the advantages of VCB over OCB?

2082






sir, iam a electrical engg graduate and i want to go in automation sector and for this i have decided to do industrial training for this,plz suggest me some good institute for the same in delhi,ncr. my degree percentage is 58%, can i get job after doing training, plz help....

1585


Define the term Capacitance and Inductance?

658


how can we phase identification in a distribution line,how we recognise that which phase is coming for a house hold connection.help me............

1591


what is frequency response?

651


Basic motor transformer generator

967


What is meant by vector group

1980


What is self exciting?

1270


Phase control and integral control are used for?

1778


how to select proper cable for ct wiring so that drop within the limit.

1459


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1569