how much brick,cement,and sand required in 1cum
brickwork(1:4)
Answer Posted / a.sanjeeva karna
brick size 0.23*0.1*0.1(1:4)
valum of brisk : 0.0023cum
say 12mm thick mortar or brick layar((0.23+.006)*(0.1+.006)*
(0.1+.006)
so volume of brick: 0.00265
no.of bricks in 1cum=1/0.00265=378 no.s
volum of brik for 1cum=378*0.0023=0.869cum
volum of mortar 1-0.869=0.131
add30% for dry mortar of =0.170 cum
add 10% for wastages =0.013 cum
total volum of mortar =0.183 cum
Say =0.200 Cum
for c:m =1+4=5
qantay of cemant 1/5*0.2=0.04 cum
1cum of cemant =(1440/50)=28.8bags
=.04*28.8= 1.152bags
sand =4/5=0.8*0.2=0.16cum
Is This Answer Correct ? | 6 Yes | 10 No |
Post New Answer View All Answers
How to find out kg per Sft ?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
what is called the inverd level of mabhole chamber?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
Why steel rods are produced only in even dimensions?
What is difference between code and standard and specification?
WHAT DLC DESIGN IN CONSTRUCTION
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
Which purpose we use deck anchor in bridges?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
How many % we consider for lap for reinforcement for estimates