How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step

Answer Posted / farvaris kumar

brick = 480 (as pr calculation)
.3= dry volume of brick mortar
cement = .3*28.8/total of ratio(6)
= 1.44 begs in one cum
sand = .3*quantity of sand(5)/total of ratio
= .255 for one cum

Is This Answer Correct ?    58 Yes 27 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the yield of 100 litres of water and 10 kg of cement in grout mix?

1581


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

400


one steel fixers how much ton steel fabrication he will do same how much tone he will binding?

1474


What is the crank length in the slab?

630


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2085






How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

1730


What are the materials used in building a gravity dam?

645


What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

2266


how to find out hard strata in bored pile when the DMC method adopted.

5323


How to take labor charges for construction of 1cum of concrete?

682


How to make a c++ program that converts any base to base 10?

1621


What is the cost difference between site mix and ready mix concrete per cubic meter

1441


How much quantity water should be placed in one cubic meter area?

893


plz.show development and anchorage length in simple diagram.

2099


acceptance criteria for concrete works

1686