concrete cube strength if fail 1 no in 7 days .What is the
solution
Answer Posted / shashank
wait till 28 days result will come some time 7 days result
will fail due to poor workmanship will pouring the cube
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Explain what is Critical Path Method (C.P.M)?
what are the types of design? which type of method is used at what type of design & why?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
how many BSCs can i connect to the HUAWEI MSC
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
how to calculate steel for slab or footings?
What are the responsibilities of a site manager?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What type of tensile strength is handling by crank in beam? Thanks.
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
what is the relation between pitch of steel and depth of slab?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
WHAT IS YOUR EXPECTED SALARY?