concrete cube strength if fail 1 no in 7 days .What is the
solution
Answer Posted / bharath
need to go for 3, 7 & 28 days. And care to be taken in WC
ratio & Cube filling process while concrete process
Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
Differentiate orthographic and isometric projections?
how meny typs of renging rod?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
what is E
what is the theoritical percentage of concrete cubes testing per day?
why +1 to be followed for calculating the no of bars in BBS. Please explain
Describe the sections included in a typical bill of quantities
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
psc girder detail
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Which brick is best for construction ,either fly ash or AAC BLOCKS
What is the average density of soil?
How to calculate volume of concrete & steel on tank foundation & ring wall ?