How many levels of approval can be allowed in Release
Strategies

Answer Posted / siva

MAXIMUM OF 8 LEVELS ARE APPROVED IN RELEASE STRATEGY

Is This Answer Correct ?    7 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?

827


What is a mrp area?

747


What is the use of ‘material status’?

676


What do the xd01 do?

700


Where the schedule margin key is customized?

758






Which documents are generated in migo 101 movement type? Which accounts are effected in the process?

751


What is 'goods movement'?

680


What is the interaction between sap mm and sap abap consultant and how does they interact?

639


What is the lot size attribute of a material?

714


What are the lot size attributes a material can posses?

710


Where do we define payment terms in po?

641


Which facility of sap will you use if you want to maintain different moving price of a material based on its origin? For ex: there is a motor if purchased from a domestic vendor or if purchased from a overseas vendor. How will you maintain different moving average price for both cases.

680


What are the procedure to create pr or po by mrp?

671


When would it be prudent to post goods movements via the shipping application?

783


Any good instructor in Noida for SAP MM ? There are lots of fake institute in Noida like Aptorn, Rector IT, Skyinfotech, etc. I have already been cheated by Aptron. Now searching any instructor who actually help to make my carrier in SAP MM Domain. If someone has any idea, pls inform me at 9811960753.

1109