how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / rocky
i wanna consruct a wall having length 1450 RFT so i wanna calculate how much cement and sand is required???
Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
how to convert cement, sand aggregate quantity from M3 to kg with full description?
where i can get material costs on weekly basis
plz.show development and anchorage length in simple diagram.
How to find permissible diagonal tensile stress in reinforced brick work
how meny typs of renging rod?
How to calculate woden area in sft and Cft
how u design STAGING for Superstructure in BRIDGE construction?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
How to calculate the quantity of ingredients of M20 grade concrete?
How much cement and water required for cement selery????
procedure for preliminary selection of size of column of 5 storey building
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
What is the minimum size of the particles of silt soil?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
how to conversation of all construction material in to brass