How can we run same job in 1 day 2 times

Answer Posted / dileep

Can we try like this?

Schedule the job for every 12hours

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hi,can any one please mention list of dimension and fact tables for Sales and Distribution System for a Pharmacutical company.

1665


Describe stream connector?

832


How do you register plug-ins?

598


what should be ensure to run the sequence job so that if its get aborted in 10th job before 9job should get succeeded?

953


Which warehouse using in your datawarehouse

1680






Explain Quality stage?

666


What are the different type of jobs in datastage?

602


I have a few records just I want to store data in to targets cycling way how?

1895


create a job that splits the data in the Jobs.txt file into four output files. You will direct the data to the different output files using constraints. • Job name: JobLevels • Source file: Jobs.txt • Target file 1: LowLevelJobs.txt − min_lvl between 0 and 25 inclusive. − Same column types and headings as Jobs.txt. − Include column names in the first line of the output file. − Job description column should be preceded by the string “Job Title:” and embedded within square brackets. For example, if the job description is “Designer”, the derived value is: “Job Title: [Designer]”. • Target file 2: MidLevelJobs.txt − min_lvl between 26 and 100 inclusive. − Same format and derivations as Target file 1. • Target file 3: HighLevelJobs.txt − min_lvl between 101 and 500 inclusive. − Same format and derivations as Target file 1. • Rejects file: JobRejects.txt − min_lvl is out of range, i.e., below 0 or above 500. − This file has only two columns: job_id and reject_desc. − reject_desc is a variable-length text field, maximum length 100. It should contain a string of the form: “Level out of range: ”, where is the value in the min_lvl field. My Question is how do you write the stage variable for reject rows.

2188


How do y read Sequential file from job control?

14402


explain about citrix scheduling tool in datastage

1808


What is the purpose of pivot stage and types of containers in datastage

609


disign the complex job in u r project?(they are aksing only complex job design and then data flow...)

2075


What is job control?

622


Why fact table is in normal form?

672