can anybody explain significance of *loval setll with example code????

Answer Posted / sree

It will set the pointer top level and it will read first
record from the data base file or device file.
ex:
FEMP IF E K DISK
*LOVAL SETLL EMP
ID DSPLY
NAME DSPLY
SETON LR

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How would display prime numbers using CL program?

5682


give an eg of ACQ-(ACQUIRE),BIT OFF,BIT ON,DEALLOC,DUMP,FEOD,FORCE,MHHZO,MHLZO,MHLLZO,MLHZO,REL,RESET,TESTZ,TESTB,TESTN----GIVE SMALL EXAMPLE TO THE OPCODES...TO UNDERSTAND FUNCTIONING...........

3290


can you debug ile rpg program using isdb?

740


Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.

2056


thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400

1898






What are the types of identifiers?

574


how can you display specific subfile page on the screen in unequal subfile?

677


what is the rpg system?

670


what is *place and *auto keyword in prtf ?plz explain

2730


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1765


How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique

551


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1566


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

774


What is the difference between iter and do?

679


How to select highest score of each subject or how to select highest income of every month?

1299