how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?

Answer Posted / k.nabadwip sharma

Calculation for Cement:-

100 cft of conc in loose 144 to 154 cft required,average of
144 and 154 is 149 cft say 150 cft.

M25 = 1:1:2=4

150cft/4=37.5cft
37.5cft/1.2=31.25bags [1 bags of cement is 1.2cft]
=31.25/2.83=11bags [1 cft = 0.0283cum x 100 cft=2.83cum]
per cum cement required=11bags

Calculation for Sand:-
11bags x 1.2 cft = 13.2 cft = 13.2 x 0.0283=0.374 cum
Per cum sand required = 0.374cum

Calculation for Aggregate:
=0.374 x 2 = 0.747 cum
per cum Aggregate required = 0.747 cum

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the meaning of degreasing of the euipment or line.

3319


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

1840


660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1108


Explain the difference between shear and tensile strength.

667


How to fix toll charge for a particular vehicle at toll booths in a highway?

1497






Which architectural movement is also known as jazz moderna?

842


we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?

1919


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

4875


What is Gsb tollens ?

1536


How can i display 5 asterisk and another 5 asterisk )?

2085


Who built the sears tower?

643


acceptance criteria for concrete works

1690


Define What is made from large rocks, which protects the base of cliffs?

665


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2143


Why are pull-out tests performed for soil nails?

758