how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / k.nabadwip sharma
Calculation for Cement:-
100 cft of conc in loose 144 to 154 cft required,average of
144 and 154 is 149 cft say 150 cft.
M25 = 1:1:2=4
150cft/4=37.5cft
37.5cft/1.2=31.25bags [1 bags of cement is 1.2cft]
=31.25/2.83=11bags [1 cft = 0.0283cum x 100 cft=2.83cum]
per cum cement required=11bags
Calculation for Sand:-
11bags x 1.2 cft = 13.2 cft = 13.2 x 0.0283=0.374 cum
Per cum sand required = 0.374cum
Calculation for Aggregate:
=0.374 x 2 = 0.747 cum
per cum Aggregate required = 0.747 cum
Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
what is the meaning of degreasing of the euipment or line.
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Explain the difference between shear and tensile strength.
How to fix toll charge for a particular vehicle at toll booths in a highway?
Which architectural movement is also known as jazz moderna?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
What is Gsb tollens ?
How can i display 5 asterisk and another 5 asterisk )?
Who built the sears tower?
acceptance criteria for concrete works
Define What is made from large rocks, which protects the base of cliffs?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Why are pull-out tests performed for soil nails?