Differenciate between One way slab and two way slab
Answer Posted / mittal
plz explain in detail, that by which calculation we cum to
know it is one way or two way and by which formula?
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
how to control PQI (Project Quality Index)
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
What is Critical path in Ms-Project ?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
what is stressing
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
How can you produce desired alloys and discuss their applications in daily life.
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
Is there the dry coefficient of cement is constant?
i need gate exam civil engineering question papers with answers
What is need for setting limits?
why development length = 50D . why not 100D