Why CT secondary should not be kept open?
Answer Posted / arvind chalka
if secondary is open then secondary current and flux will be zero. so that total flux is increased.
emf is directly proportional to flux than there will be induced a high voltage that saturate the core and demage the transformer.........thus we should not be open secondary .
| Is This Answer Correct ? | 89 Yes | 9 No |
Post New Answer View All Answers
What kind of maintenance is conducted for Transformer
How to calculate the input cable rating for 10kva ups (3phase input and single phase output and also 3phase output, battery rating 65Ah)provide the formula also.thnx
Differentiate between voltage and current feedback in amplifiers?
what is LSR?
What is CCM in Electrical ? where can we use this material?
Yazaki india pvt ltd interview questions qurey related
how many safety really of DG sets.
can mini-curcuit supply MIL-tested transformer !
Hello Friends, How can we recognize the CT Star Point is S1 or S2 in case of Electro Mechanical Relays and what is meant by Restraining coil in relays and what is the purpose of that.. thank you in advance..
Why r u using pf panel. what the uses
what are the possible reaons & remedies if resistance of NGR getting heat up
What do you mean by dependent and independent voltage sources?
What do you mean by pull of electromagnet?
What happens to a line-frequency of high-frequency transformer when it is first energized/ re-energize?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)