Can HT cable(11kv cable) be used for 415V, 700A requirement.
Answer Posted / ranjit
Actually we cant use HT cables on 415 V LV side because of
without neutral cable. we can use HT cable with neutral
additionally. Neutral cable based on copper size which is
inside on HT cable. Because normally HT cable insulation
more less copper. because HT side High voltage less
current. But economic wise this is not good idea also.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper
What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.
hi friends this is a newcomer in your community of enthusiastic peoples. i am preparing for SSC (CPWD JUNIOE ENGG EXAM FOR ELECTRICAL) pls guide me on the same how to crack it? PLS LET ME KNOW IS ANYONE THERE WHO PASED IT? CAN I GET THE QUESTION PAPERS OF PREVIOUS EXAMINATIONS?
What is the need for a controller?
what is the best transformer oil breakdown voltage?
i have attended the interview on 4th June,08 at Kolkata in IOCL, can anybody tell me what is its result
I have doubt that the supply HZ (very low or high than rated ) may affect the power factor. is it true. ?
how does directional relay work incase of ac ?
How may I get the maximum current capacity for a particullar size Alluminum or Copper cable if there is compulsion to use?
how we can calculate the efficiency of a diesel generator ?
what is interpose? where it is used and why it is used?
What is dc current source? Differentiate between ideal and non ideal current sources?
what is the difference between the characteristics of two different phase bushing of any transformer
how to select diiferent power transformers of same capacity on no load loss and full load loss by economical point of view.?
how to calculate the tarriff for an industry whose kva demand is 10 mva