tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4
Answer Posted / surya v kuchibhotla
If you are considering 1:4:8; per each cubic meter you have
to arrive the quantities as under.
If 1+4+8= 1cum (dry mix); then
cement quantity will be 1/13 = 0.077 cum;(2.2 Bags of 50kg)
Sand Quantity will be 4/13= 0.31 cum and
the Quantity of Coarse aggregate shall be 8/13=0.62 cum.
But, the volume of dry concrete will be 1.5 times
(approx)the volume of wet concrete. So, if you want to
prepare a cum of wet concrete, multiply the above values by 1.5.
Is This Answer Correct ? | 90 Yes | 21 No |
Post New Answer View All Answers
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
What is the per cu. mt. price of ready mix in Gujarat region.?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
Special thing in designing a overhead reservoir ? which is different from an ordinary design
what is m30 in concrete tiles
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
What do you mean by honeycomb in concrete?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
Specific gravity of cement?
What is rolling stock
will fix foundation bolts at site with out template is there any procedure?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L