explain bug life cycle

Answer Posted / vidya

The duration or time span between the first time bug is
found (‘New’) and closed successfully (status: ‘Closed’),
rejected, postponed or deferred is called as ‘Bug/Error
Life Cycle’.

(Right from the first time any bug is detected till the
point when the bug is fixed and closed, it is assigned to
various statuses which are New, Open, Postpone, Pending
Retest, Retest, Pending Reject, Reject, Deferred, and
Closed.

There are seven different life cycles that a bug can passes
through:

< I > Cycle I:
1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) Test lead finds that the bug is not valid and the bug
is ‘Rejected’.

< II > Cycle II:
1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) The bug is verified and reported to development team
with status as ‘New’.
4) The development leader and team verify if it is a valid
bug. The bug is invalid and is marked with a status
of ‘Pending Reject’ before passing it back to the testing
team.
5) After getting a satisfactory reply from the development
side, the test leader marks the bug as ‘Rejected’.

< III > Cycle III:
1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) The bug is verified and reported to development team
with status as ‘New’.
4) The development leader and team verify if it is a valid
bug. The bug is valid and the development leader assigns a
developer to it marking the status as ‘Assigned’.
5) The developer solves the problem and marks the bug
as ‘Fixed’ and passes it back to the Development leader.
6) The development leader changes the status of the bug
to ‘Pending Retest’ and passes on to the testing team for
retest.
7) The test leader changes the status of the bug
to ‘Retest’ and passes it to a tester for retest.
8) The tester retests the bug and it is working fine, so
the tester closes the bug and marks it as ‘Closed’.

< IV > Cycle IV:
1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) The bug is verified and reported to development team
with status as ‘New’.
4) The development leader and team verify if it is a valid
bug. The bug is valid and the development leader assigns a
developer to it marking the status as ‘Assigned’.
5) The developer solves the problem and marks the bug
as ‘Fixed’ and passes it back to the Development leader.
6) The development leader changes the status of the bug
to ‘Pending Retest’ and passes on to the testing team for
retest.
7) The test leader changes the status of the bug
to ‘Retest’ and passes it to a tester for retest.
8) The tester retests the bug and the same problem
persists, so the tester after confirmation from test leader
reopens the bug and marks it with ‘Reopen’ status. And the
bug is passed back to the development team for fixing.

< V > Cycle V:
1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) The bug is verified and reported to development team
with status as ‘New’.
4) The developer tries to verify if the bug is valid but
fails in replicate the same scenario as was at the time of
testing, but fails in that and asks for help from testing
team.
5) The tester also fails to re-generate the scenario in
which the bug was found. And developer rejects the bug
marking it ‘Rejected’.

< VI > Cycle VI:
1) After confirmation that the data is unavailable or
certain functionality is unavailable, the solution and
retest of the bug is postponed for indefinite time and it
is marked as ‘Postponed’.

< VII > Cycle VII:
1) if the bug does not stand importance and can be/needed
to be postponed, then it is given a status as ‘Deferred’.

This way, any bug that is found ends up with a status of
Closed, Rejected, Deferred or Postponed.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is an end-to-end testing?

627


What is the main use of preparing traceability matrix and explain the real time usage?

745


What is application programming interface (api)?

655


What do you plan to become after say 2-5yrs (Ex: QA Manager, Why?)

1664


What are the factors affecting a manual testing project and what are the ways to overcome it?

726






What exactly is quality control?

731


1.Tell me negative test cases for notepad 2.Tell me the factors for for writing severity based test cases

5544


Why testers wil prepare useracceptance testcases,system testcases and integration testcases,What is the differenece between all this test cases

1611


What is the difference between functional testing and integration testing?

715


When we use integration testing for any new system so why we required system testing.

1551


what is functional testing terminologies

1917


Can you explain equivalence partitioning?

598


what are questions asked in TCS for database tester (sqlserver)?ay idea

2475


what are the types of Bug?

1064


test cases on bangles???

2548