What are the issues that you have faced while moving your
project from the Test Environment to the Production
Environment? Please explain in depth

thanks in advance

Answer Posted / prabhu

You will mostly get the below issues

1)You need to change the current value in sequence
generator.
2)When you use union transformation export and import may
not work at times
3)when u have used absolute path for source,tgt and
parameter file names it might be a problem.
4)Unix files exported might contain control m characters

Prabhu
www.iskilltech.com

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is sq transformation?

670


How to display session logs based upon particular dates. If I want to display session logs for 1 week from a particular date how can I do it without using unix. ?

1612


Sequence generator, when you move from develoment to production how will you reset

1412


whats the logic to load the lower level of granularity of data to fact table.

1808


Whats there in global repository

1272






Performance tuning( what you did in performance tuning)

1489


Explain lookup transformation is active in informatica

665


What are the databases that informatica can connect to windows?

587


How many number of sessions can one group in batches?

698


what are factless facts? And in which scenario will you use such kinds of fact tables.

1317


what kind of issue you will get in environment? (we ll call help desk to raise ticket rite?

1626


What is the difference between a repository server and a powerhouse?

820


What is meant by a domain?

632


Can some one explain me about Telecommunications(wireless) project in Informatica? Thanks in advance

1564


What does command task mean?

614