If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answer Posted / hitesh kanpariya
No, sometimes material delivered on the site may be different or we can say its natural material so base on that we have to compact it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
What is the sugested procedure of water purification for public supply?
Concrete cover for slab, column, beam and footing?
how i get all type of short type question answer about civil engg
How to find CN by using arcgis 9.3?
How to find out kg per Sft ?
i need gate exam civil engineering question papers with answers
what is mc arther pile?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
What is meaning of FREE STANDING STAIRCASE ?
What are the causes of building collapse?
What in bending moment, if a moment is free end of cantilever beam?
whaat is blister in box girder bridge and what is its function..