If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).

Answer Posted / hitesh kanpariya

No, sometimes material delivered on the site may be different or we can say its natural material so base on that we have to compact it.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to design and calculate materail quantity for concrete speedbreaker ?

5384


What are the types of slump?

642


how to calculate mivan shuttering matrial

976


rate analysis hiring of generator 62.5 KVA

1684


What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

3796






sir how can we find the cement and sand required for making 4" drop

1651


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

1602


HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?

1756


What is the life of anaerobic Digester if it is used for municipal solid waste digetion.

1813


what is the ingredient value of 40mm and 20mm aggregates?

1557


What is the diff between cad & cadd?

657


What is Critical path in Ms-Project ?

701


Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

1939


What is the difference between absorption & adsorption and sorption?

755


what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?

1160