A water/cement ratio of only 0.38 is required for complete
hydration of cement. (Although this is the theoretical limit, water cement ratio lower than
0.38 will also increase the strength, since all the cement that is added, does not hydrate)
Water added for workability over and above this water/cement ratio of 0.38, evaporates
leaving cavities in the concrete. These cavities are in the form of thin capillaries. They
reduce the strength and durability of concrete. Hence, it is very important to control the
water/cement ratio on site. Every extra lit of water will approx. reduce the strength of
concrete by 2 to 3 N/mm2 and increase the workability by 25 mm
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
what is the types of surveying?which type of survey carrying for type of work?
how much repeitation for conventional and maivan formwork?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
What is horizon or horizontal mining?
material used for mendrel use to bend epoxy coated rebar
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to check slab shuttering level.? Or check list for slab ?
on what basis the partial factor of safety are decided? form the load combinations
what is pouring and explain
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How to calculate volume of concrete & steel on tank foundation & ring wall ?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster