WHAT ARE THE DATAS REQUIRED FOR SCS SIGNAL LIST PREPARATION?
Answer Posted / a.p.nanjappa
It depends on your SUB STATION CONTROL SYSTEM (SCS)
supplier and client, and load despatching authority SCADA
system.
Generally Load despatching authority demand:
I) Remote control -on-off control oF CB,STATUS OF
INDICATION,PROTECTION AL+TRIP SIGNALS ,FEED BACK SIGNAL.
OLTC COUNTER,
2) INDICATION - A,V,F,PF, MW,MVAR,
3) METERING IN -OUT MWH,MVARH,
4) sTATUS OF ALL CB,DS,ES, PLC,
5) MAIN BUS ,INCOMMING,OUT GOING.
6)SUB STATION dc VOLTAGE, UPS ALARM
7)FAULT LOGGER REPEATITION SIGNAL.
THIS IS A VERY EXPENSIVE TASK. SCS SUPPLIER MUST FINALIZE
CLEARLY,AFTER FINALIZING SIGNAL SUCH ,AS DI,DO,AI,AO ,LOGIC
SEQUENCES, SHALL PROCEED HIS WORK.
tARIFF METERS ARE VERY EXPENSIVE. SCS MUST FOLLOW LOAD
DESPATCHING REGULATION AND ITS SPECIFICATION.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
i completed my DEEE. and i want to electrical c license. how to get it..?
Explain using drawings what is reverse PID action w.r.t PID controllers.
How to know the following data of synchronous generator 1. D-Axis Unsaturated Reactance 2. D-Axis Unsaturated Transient Reactance 3. D-Axis Unsaturated Sub - Transient Reactance
sir vizag steel ka junior trainee ka paper kitne number ka ayega
How one can check the MAIN of a house wiring ?
WHY THREE PHESE SYSTEM VOLTAGE APPLIED IN 440 VOLT
i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected
what is the Pickup/drop off ratio in BCPU relays
How to calculate the Harmonics losses in terms of cost/unit.
What is creepage distance..... what will be the value for different voltage level
what is the voltage between earth & neutral in 3 phase electrical connection.
How many types of probe used in cro?
which book to refer in electrical engineering for iocl exam & which book for general english.
Advantages/Disadvantages of earthing of neutral bus on MSB instead of separate neutral earthing for transformer/DG sets feeding to MSB
please send the IS strandard for electrical to sakthi_murugan86@yahoo.co.in