How can I calculate the Compressive strength of cubes after 28
days of curing?Is there any formula or ration ?
Answer Posted / mugundhan979
AS PER IS CODE FORMULA WAS Fck + 1.65 S
Fck - concrete grade
for M 20 ,M 25 grade s value 4
above M 25 s value was 5
| Is This Answer Correct ? | 24 Yes | 5 No |
Post New Answer View All Answers
What quantity of 1.0 m3 bricks required?
what is the exact dia of 8swg and 10swg gabion wire
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
give me the rate analysis for Bituminous Macadam and SDBC
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What is meant by dimensioning?
what is the anchorage length of reinforcement.
What is proportion of PCC Grade G?
Why should pumping be not used in case of concreting works?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
brickwork labour rate per cum ?