Answer Posted / ramachandra reddy
On TRANSFORMER OIL BREAK DOWN VOLTAGE test is carried out which is done on field while filling the oil in transformer. This process is also called oil filtration.
1.Take sample from top of Transformer before filtration.
2.The BDV of oil should withstood min 50 KV
3.The gap between the test electrodes sample to be 2.5mm maintained
4.At least 5 sample(top/bottom) should be checked separately while filtration.
5. The samples should withstand 50 kv for 1 min.
5. Take the average of all the samples timings.You will get value.
7.Procedure
a.Voltage should be gradually increased from 0.
b. At one point Flash will take place and that point is
termed as Bread down Voltage
| Is This Answer Correct ? | 26 Yes | 4 No |
Post New Answer View All Answers
Define cut-off rate?
How to calculat the ratio of HT\LT in energy meter
Why field rheostat is kept in minimum position while armature rheostat at maximum position?
Is there chopping current in resistive circuit
What is value of earth resistance required for substation and equipment earthing and what are the reference guidelines
What is the difference between a Root Locus plot and a Bode plot?
What is the difference between multimeter
CAN CU XLPE/PVC CABLE BE USED INPLACE OF LOW NOISE SCREENED CABLE? KINDLY GIVE REASONS
sir i am apearing for nic exam.i dont know exam pattern.can you please send me some model papers
Classify driling machines.
Differentiate between Zero and Negative sequence current
two way ckt diagram can be drawn by how many ways? give diagram
Don't you have similar question banks related to Oral Certification Examination conducted by Mercantile Marine Departments / Directorate of Shipping, Ministry of Shipping for Electro Technical Officer?
What is lighting kitts.
why we cannot protect 100% winding of an alternator by using differential protection?