120 kva means you have to supply 3 phase load.
3 phase load with 415 v and unity pf can take a current
according to eqn kva=1.732*Kv*I
I=120*1000/(415*1)=290 A appr

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

does buccholz in a transformer use batteries

3962


any idea abt REVERSE METERING concept.........?

1744


what is the pulse and audio frequency transformer? what is different between induction regulators and tap changing transformer?

1642


what is the difference between elcb and rccb ?

1782


DERIVE AN EXPREION FOR MAXIMUM POER TRANSMISSION, WHAT ARE ITS APPLICATIONS.

1595






What are the advantages of hydropower?

661


he compression ratio for a petrol engine generally lies between

709


Why we use duplex coil and hook switch in telephone system?

4586


Explain about c.t?

708


how can I calculate charging current of cable/overhead conductor? what is roll of voltage in it ?

3234


a simple c++ program to calculate simple interst with its data members as private

1393


May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?

1028


how we calculate the withstansing current capacity of wires&cables?

1491


Which of the following alternatives will be cheaper (1) A 100 h.p AC, 3-phase motor (2) Four motors of 25 h.p each (3) Five motors of 20 h.p each (4) 10 motors of 10 h.p each explain

2522


what is the differencce inn series and cascade connection??

4244