Answer Posted / mbalakiran
Hi,Let me know..if i'm wrong...
Actually..QA Process is project oriented
QA process will start from Verification and ends with validation.
In Verification phase...involves from system requirements to verify "Are we developing the right product or not"
and validation phase "Are we developed right product or not"
Which Includes Testing life cycle,
1.Test Planning
2.Test Case Designing
3.Test Execution
4.Reporting & Tracking
5.Test Closure
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to connect oracle with test director? in testdirector we will be getting only reports? pls answer Thanks in Advance
When the GUI Testing will be held on the V model ?
Is an "A fast database retrieval rate" a testable requirement?
what is the architecture of your current project?
Which testing model is best as per your understanding, and why?
hi what are the test cases for web application..i need these example..please..mail me at mina_ims@yahoo.com
I have interview on Guide wire testing. If you please share me.
What is Mixed Testing
What are the types of maintenance?
How can you prepare the resume for testing? Can you send me the answer for this questions?
What is Bomb Testing?
IF ASCII_CODE_OF_ENTERED_CHAR is less than 44 THEN reject it ELSE IF ASCII_CODE_OF_ENTERED_CHAR is greater than 56 THEN reject it ELSE it's a digit, so accept it Which one of the following sets of ASCII codes do you use to test the sample code above WITHOUT redundant coverage?
structure of an incident report is covered in stand for software test document IEEE 829 and is called as?
How to test a Falsh player scrollings?
WHAT IS OBJECT REPOSITORY? AND IT TYPES? HOW MANY TYPES OF ACTIONS ARE THERE IN QTP? CAN WE ADD NEW OBJECTS AND PROPERTIES INTO SHARED OBJECT REPOSITORY?