If the maximum demand is 120 KVA in a building, then what is
the Current taken according to load given ? Formula for it ?
Answer Posted / basharat khan
a Generator of 1KVA can supply upto 1.4 amps, so the maximum load could be 1.4*120
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
why transformer ratings in kva? & DG ratings in kva? & Motor ratings in kw/HP?
how to store the thunder power?
What is the effect on in Zone and out zone fault if Phase side CT is Vk/2<30 mA and Neutral side is CT is Vk/4<30 mA for Transformer REF protection
What is the main purpose of c.f.b.c.boiler
wHAT IS CAPACITANCE LATCHING? hOW TO CALCULATE CAPACITANCE LATCHING? hOW TO SOLVE THE PROBLEM IF CAPACITANCE LATCHING APPLIED?
plz tel me syllabus and exam date 4 jr executive engg (electrical)
why it is not advisable to run low rating (19KVA) DG sets in parallel for long durations even though they are provided with droop ckts (QDC)
How many lightning arrestors to be installed on 50MX60MX10M building and is there any formular for that?
what is the difference between earth leakage and earth fault?
What happen when change order of CT in GIS feeder?
how to find motors H.P. whout any rating? (only give you a motor and multimeter)
How would you calculate power loss in a resistor?
what is the solution for meger test failed the MV cable?
How o select the electrical fuse?.What are its characteristics.How to select the material od fuse?
Explain how you intend to work under pressure to meet up with deadline target?