How can we assign measuring points to a strategy plan like
compressor running hrs

Answer Posted / asheesh aswal

Go to the change equipment transaction , then extra, then
add or replace counters. then select the desired counter by
F4 help. you can't directly add counters or measuring pts
to a maintenance plan.
u can do this for equipment ,FL and PRT only.

Is This Answer Correct ?    13 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is it possible to determine header tasks automatically at save without selecting the save + determine tasks button?

480


Do we need to run this transaction code ip30 for all the maintenance plans which are scheduled on regularly daily basis or weekly basis so that if any scheduled object exists then it will get converted into the service order ?

640


Is it possible to assign a user status to the operation and sub operation of a maintenance order?

524


Is it necessary to run the ip transaction code for each maintenance plan that we have scheduled ?

512


Is it possible to create and schedule a maintenance plan without task list?

492






What do the ca85 tcodes in sap- pm mean?

481


what do you mean by reverse counter?

536


Explain the integration points between pm and mm/fico during the pm configuration?

1056


Where do we use multiple counter maintenance plans? Explain with an example?

509


What is the use of warranty claim processing function?

477


What is maintenance planning? What are different types of maintenance planning?

645


Differentiate between cost center and work center

453


Which material type is used for maintenance spare parts?

477


What is the menu path for displaying the structure of a functional location in list form and as a graphic?

548


What is the integration between pm and qm in sap?

552