what"s the responsibilities for QC(quality controler)in high
rise buildings?

Answer Posted / raghavendra

The QC engineer ensures the work is carried out according
to the project contract specifications,project quality plan
(PQP),inspection and test plan(ITP)....He is also
responsible for timely reporting of any non-comformance,un-
approved material usage etc. etc.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2039


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1595


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2143


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

2855


How many square meter can a worker/labor demolish a structure per day?

1522






What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?

1336


how to preaper for interview wat they asked in interview give me idea

2171


In block work seawalls what is the purpose of slip joints?

755


"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

1623


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

1612


if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.

1584


How to marking the building

1496


how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.

1499


why the openings of sieves are square io size?

1096


what is the relation between pitch of steel and depth of slab?

2905