Answer Posted / snehal
Testing can start, When clients are giving the information
to SRS , tester are test the product depending upon the
requirement using the Static testing.after that many
testing type are use for each phase using SDLC .
STOP TESTING:
1 More % of test cases are pass
2 less time for product are release
3 using sanity testing
BUT WHENEVER PRODUCT/SOFTWARE ARE NOT 100% BUG FREE.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
When we use integration testing for any new system so why we required system testing.
What is an entry criteria?
what do you mean by Develop test data through sourcing (or) handcrafting techniques
how will we change the server system time?
How will u decide test data to see that evey feature is thoroughly tested
What is white box testing?
. Is any graph is used for code coverage analysis?
Can u give me explanation about section 508 testcase and Testcase for this section. It need a details checklist for the same Manimozhi
1)can u tell me, what is the roles and responsibles for database tester in DB testing from requirement stage to UAT stage....2) what are the i/p documents he wants and who wil give the i/p docs. to DB tester.and tell me what exactly db test case means what?
What is middle ware testing?? what are the companies using this tech?
can any body tell me what is the process of between after getting a documents and testcase writing.
which of the following is not a coding defect? Option 1 Test harness defect Option 2 Data flow defect Option 3 Initialisation defect Option 4 Algorithmic defect
What is system level testing?
How will you determine when to stop testing?
how to test a web application manually?can u explain indetail?