calculate qty of sand in 15 mm plaster for 100 sqm.
Answer Posted / er. shivam dixit
15 mm plaster for 100 sq. m.
then the total quantity = 1500 cu. m.
let us consider the cement plaster proportion is 1:4
then the total sum of the proportion = 5
total dry mortar required for 1cu. m. = 0.40
the sand required for one cu. m. = (4*0.40)/5 = 0.32 cu. m.
so the total sand required 15mm plaster for 100 sq.m.
= 15*100*0.32 = 480 Cu.m.
Is This Answer Correct ? | 2 Yes | 36 No |
Post New Answer View All Answers
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
What is semirigid connections?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
What in your past experience or education prepares you for the position for which you are applying
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
How to calculate the crank rod in slab
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
how to find quantity of concrete in PCC M15
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
How do you calculate the power of centrifugal pump?
what is the difference between prime coat and tack coat in road construction