what is the real de-shuttering time for rcc column,slaband
wall

Answer Posted / royalcivil

the de-shuttering time for the slab is 21 days must.
for the column it should be minimum of 1 week

Is This Answer Correct ?    10 Yes 26 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

1518


How many % we consider for lap for reinforcement for estimates

1362


How is the strength of cement measured?

707


What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code

1846


Describe the sections included in a typical bill of quantities

1784






What is Curtailing of R/F

1979


How much is the cover for slab?

727


why we are using stub column..? is it possible to construct steel stub column..?

1508


how much tempareture are required to make liquid state of pid leed

1708


I have an span length 16 ft c/c

1057


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

1631


does a b.tech civil engineer fresher supposed to know how to design rcc structure?

3007


A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.

1713


What is the difference between EPC,DBOOT and BOOT.

23335


How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit

5698