what is the real de-shuttering time for rcc column,slaband
wall
Answer Posted / royalcivil
the de-shuttering time for the slab is 21 days must.
for the column it should be minimum of 1 week
Is This Answer Correct ? | 10 Yes | 26 No |
Post New Answer View All Answers
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
How many % we consider for lap for reinforcement for estimates
How is the strength of cement measured?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
Describe the sections included in a typical bill of quantities
What is Curtailing of R/F
How much is the cover for slab?
why we are using stub column..? is it possible to construct steel stub column..?
how much tempareture are required to make liquid state of pid leed
I have an span length 16 ft c/c
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
What is the difference between EPC,DBOOT and BOOT.
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit