Out of 4 mill records only 3 mill records are loaded to
target
and then job aborted. How to load only those 1 mill(not
loaded records) for next run.
This job is not sequential job, it is stand alone parallel
job.What are the possibilities available in datastage8.1?
Answer Posted / chethankumar
just use checkpoint option
| Is This Answer Correct ? | 4 Yes | 5 No |
Post New Answer View All Answers
What is orabulk stage?
What are the types of containers?
What are the components of ascential data stage?
What are the steps required to kill the job in Datastage?
What is the use of datastage designer?
Define project in datastage?
CHANGE CAPTURE
What is merge stage?
If you want to use the same piece of code in different jobs, how will you achieve it?
Difference between IBM DATA STAGE8.5 and DATA STAGE9.1 ?
Explain ibm infosphere information server and highlight its main features?
What is ibm datastage?
What is the difference between in process and inter process?
Describe the main features of datastage?
What are stage variables, derivations and constants?