how cubic feet cement,sand,aggregate required for 1 cubic feet
ratio=1,1.5,3
Answer Posted / mohammed aijaz hussain
Volume of concrete = 1 cu.ft.
Volume of Dry concrete = 1.5 X 1 = 1.5 cu.ft.
Volume of cement required = 1/ 5.5 X 1.5 = 0.273 cu.ft.
= 0.22 Bag = 11 kg.
Volume of sand required = 1.5/5.5 X 1.5 = 0.41 cu.ft.
Volume of aggregate = 3/5.5 X 1.5 = 0.82 cu.ft.
| Is This Answer Correct ? | 19 Yes | 8 No |
Post New Answer View All Answers
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
Is there any course for billing available in Mumbai? If yes then please mail me the details..
How do You Maintain a structure after getting cube test of low strength.
Technical Question of Civil Engineering
Calculation of curtain wall of box culvert
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
For what building Built-on balconies are preferable? What are the advantages?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
What are the reasons for geotechnical site investigations in uganda?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?